亚洲国产成人久久一区-日韩精品亚洲一区在线-av中文资源在线观看-欧美成人综合在线观看

國(guó)產(chǎn)自拍??_久久久久久婷??-藝文筆記

王金豹 2025年11月04日 05:33:09
發(fā)布于:曼谷

國(guó)產(chǎn)自拍??_久久久久久婷??_.手.動(dòng).輸.入.網(wǎng).址.聯(lián).系.客.服.人.員.lanan_shell

TASK 27-00-00-810-801 ?Display of an Operational Warning on the Upper ECAM DU

?1. Possible Causes _______________ ?- Message on the Post Flight Report (PFR) ?2. Job Set-up Information

______________________ ?Not Applicable

?3. Fault Confirmation

__________________ ?A. Test ?Not applicable, no confirmation test is necessary.

?4. Fault Isolation _______________ ?A. Do a check for a Message on the Post Flight Report (PFR). ?If there is no message, no action is necessary. R If there is a message, do the trouble shooting procedure related to the R maintenance message. ?NOTE : Some operational Warnings are not printed on the PFR. ____

?AILERON - FAULT ISOLATION PROCEDURES ____________________________________ ?TASK 27-10-00-810-801 ?Loss of Signal on the Left Pedals for the ELAC 1 ?1. Possible Causes _______________ ?- ELAC-1 (2CE1)

?- XDCR UNIT-PEDAL POS, L (25CE1)

?- wiring from the ELAC 1 (2CE1) to the transducer unit (25CE1)

?2. Job Set-up Information ______________________ ?A. Referenced Information ?-------------------------------------------------------------------------------REFERENCE DESIGNATION ------------------------------------------------------------------------------- AMM 27-24-00-710-001 Operational Test of the Rudder Hydraulic Actuation AMM 27-92-15-000-001 Removal of the Pedal Position Transducer Unit (25CE1,25CE2) AMM 27-92-15-400-001 Installation of the Pedal Position Transducer Unit ?(25CE1,25CE2) ?AMM 27-93-34-000-001 Removal of the ELAC (2CE1,2CE2) ?AMM 27-93-34-400-001 Installation of the ELAC (2CE1,2CE2)

R ?AMM 27-96-00-740-001 BITE Test of the EFCS (Ground Scanning) ASM 27-92/23 ?3. Fault Confirmation __________________ ?A. Test ?(1) Do the operational test of the rudder hydraulic actuation (Ref. AMM TASK 27-24-00-710-001).

?(2) Do the BITE test of the EFCS (Ground Scanning) (Ref. AMM TASK 27-96-00-740-001).

?4. Fault Isolation _______________ ?A. If the BITE test gives the maintenance message: ?ELAC1 OR INPUT OF L PEDALS XDCR UNIT 25CE1

?- replace the ELAC-1 (2CE1), (Ref. AMM TASK 27-93-34-000-001) and (Ref. AMM TASK 27-93-34-400-001). ?(1) If the fault continues: ?- replace the XDCR UNIT-PEDAL POS, L (25CE1), (Ref. AMM TASK 27-92-15-000-001) and (Ref. AMM TASK 27-92-15-400-001). ?「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞27-10-00∞∞∞∞∞∞∞∞∞∞Page 201 ?May 01/00 CES (2) If the fault continues:

?- do a check and repair the wiring from the ELAC 1 (2CE1) to the transducer unit (25CE1) (Ref. ASM 27-92/23). ?B. Do the operational test and the BITE test given in Para. 3.

?Loss of Signal on the Right Pedals for the ELAC 1 ?1. Possible Causes _______________ ?- ELAC-1 (2CE1)

?- XDCR UNIT-PEDAL POS, R (25CE2)

?- wiring from the ELAC 1 (2CE1) to the transducer unit (25CE2)

?2. Job Set-up Information ______________________ ?A. Referenced Information ?-------------------------------------------------------------------------------REFERENCE DESIGNATION ------------------------------------------------------------------------------- AMM 27-24-00-710-001 Operational Test of the Rudder Hydraulic Actuation AMM 27-92-15-000-001 Removal of the Pedal Position Transducer Unit (25CE1,25CE2) AMM 27-92-15-400-001 Installation of the Pedal Position Transducer Unit ?(25CE1,25CE2) ?AMM 27-93-34-000-001 Removal of the ELAC (2CE1,2CE2) ?AMM 27-93-34-400-001 Installation of the ELAC (2CE1,2CE2)

R ?AMM 27-96-00-740-001 BITE Test of the EFCS (Ground Scanning) ASM 27-92/23 ?3. Fault Confirmation __________________ ?A. Test ?(1) Do the operational test of the rudder hydraulic actuation (Ref. AMM TASK 27-24-00-710-001).

?(2) Do the BITE test of the EFCS (Ground Scanning) (Ref. AMM TASK 27-96-00-740-001).

?4. Fault Isolation _______________ ?A. If the BITE test gives the maintenance message: ?ELAC1 OR INPUT OF R PEDALS XDCR UNIT 25CE2

?- replace the ELAC-1 (2CE1), (Ref. AMM TASK 27-93-34-000-001) and (Ref. AMM TASK 27-93-34-400-001). ?(1) If the fault continues:

?- replace the XDCR UNIT-PEDAL POS, R (25CE2), (Ref. AMM TASK 27-92-15-000-001) and (Ref. AMM TASK 27-92-15-400-001).   www.aero.cn 航空翻譯 www.aviation.cn 本文鏈接地址:A320 Trouble Shooting Manual 排故手冊(cè) 飛行操縱 1

原標(biāo)題:
95 個(gè)人收藏 收藏

評(píng)論交流

這位訪客請(qǐng)「登錄」后參與評(píng)論

相關(guān)推薦

  • 英銀:支持現(xiàn)有退歐計(jì)劃 無(wú)協(xié)議也可能加息 聽(tīng)了卡尼一席話 英鎊更“激動(dòng)”了

      所以,停止這場(chǎng)投射游戲,把目光收回到自己身上,去花時(shí)間尋找那些能讓自己釋放光芒的事物。
  • 華泰期貨:燃油強(qiáng)勢(shì) 內(nèi)外盤(pán)價(jià)差拉大

      (聲明:本文僅代表作者觀點(diǎn),不代表新浪網(wǎng)立場(chǎng)。)?
  • 整次牙能買(mǎi)輛車(chē),顏值焦慮背后的隱形暴利

      1、登機(jī)前三天內(nèi)(當(dāng)天也行)填寫(xiě)電子入境表(SGArrivalCard),建議出發(fā)前自己去新加坡ICA網(wǎng)站填寫(xiě),除個(gè)人基本信息外,需要航班號(hào)、酒店名稱(chēng)等,有些航空公司會(huì)提醒。
  • 長(zhǎng)安朱華榮是誰(shuí)的嘴替?

      2015年,一位蘋(píng)果員工曾通過(guò)郵件向BusinessInsider爆料,暗示蘋(píng)果正在開(kāi)展一個(gè)「和特斯拉競(jìng)爭(zhēng)」的項(xiàng)目,而且會(huì)有不少特斯拉員工跳槽前來(lái)。同時(shí),蘋(píng)果的機(jī)構(gòu)投資者之一的CarlIcahn也對(duì)外表示,蘋(píng)果汽車(chē)將在2020年投放市場(chǎng),蘋(píng)果會(huì)將車(chē)看作是“終極的移動(dòng)設(shè)備”。
  • AMD再創(chuàng)歷史新高

      電池安全方面,五菱繽果PLUS搭載五菱液冷神煉電池,電池內(nèi)部10通道并行設(shè)計(jì),通過(guò)液冷液熱系統(tǒng),讓運(yùn)行中的電池始終維持適宜工作溫度,提升續(xù)航表現(xiàn),輕松解決夏季電池過(guò)熱無(wú)法充電、冬季低溫充電慢的困擾。
  • 2018新浪教育盛典候選機(jī)構(gòu):漢晟教育

      周潔瓊的小香風(fēng)款式開(kāi)衫毛衣在紅色、粉色、棕色之間做了漸變?nèi)诤稀>碌目钍礁m合搭配小而精巧的首飾一起。如果你是第一次見(jiàn)對(duì)方父母,那還是建議要隆重些哦:)
  • 數(shù)據(jù)梳理潛在高分紅股 35只低估值個(gè)股值得期待

      歐派家居-花序Flowring、索菲亞-卡爾系列、睿住智選-“六大空間、十二種智能生活方式”、顧家全屋定制-星·覓境系列、頂固集創(chuàng)家居-頂固翊·境系列、皮阿諾-青律、尚品宅配-新銳生活系列“晨光奶咖”、兔寶寶全屋定制-梵爾、金牌櫥柜的X空間集成系列、瑪格全屋定制-幻境系列、百能家居-萬(wàn)東格洛櫥柜、健威家居-圖蘭朵系列、大自然家居-橡木生活、志邦家居-楓丹白木、博洛尼-象外之音、科凡-烤漆系列“闊境客廳”、HD-孟隱黑金系列、伊仕利家居-「奈菲」系列、飛美家具-深情極簡(jiǎn)主義系列、客來(lái)福全屋定制-“蝶變”系列、曲美家居·B8系列、伊戀全屋定制-客廳空間——萊茵微光、亞丹家居-尼婭、艾依格全屋定制新貴系列-意式輕奢、TATA木門(mén)-至臻系列磁吸靜音門(mén)、夢(mèng)天木作-夢(mèng)浸、尚品本色-意向N、3D無(wú)漆木門(mén)名仕385、金迪-暮光奶油、春天全屋定制-春天多功能衣帽柜、友邦筑家掛掛墻、鼎美裝配化頂墻門(mén)柜鼎美無(wú)膠大板、法獅龍家居-法獅龍·瓏驤高顏整裝·至尊版套餐。
  • 國(guó)際金價(jià)屢創(chuàng)新高 銀行力推積存金

      研究表明,人類(lèi)體內(nèi)的各種細(xì)胞幾乎都有大量基因的表達(dá)。然而,人受精之后大約有兩天的時(shí)間非常特殊,這段時(shí)間的胚胎幾乎沒(méi)有基因表達(dá)。科學(xué)家們找到了啟動(dòng)人類(lèi)基因組表達(dá)的關(guān)鍵分子(Oct4),發(fā)現(xiàn)在進(jìn)化歷史中,最先出現(xiàn)的基因(老基因)會(huì)先表達(dá)、而最后出現(xiàn)的基因往往會(huì)后表達(dá)。該研究還揭示了人類(lèi)進(jìn)化的一個(gè)重要新機(jī)制。科學(xué)研究表明,DNA的突變會(huì)引起人類(lèi)的進(jìn)化,DNA序列中有一類(lèi)被稱(chēng)為轉(zhuǎn)座子的DNA片段,它們常常會(huì)從一個(gè)區(qū)域跳到另一個(gè)區(qū)域,這種跳動(dòng)會(huì)產(chǎn)生DNA突變。此次研究成果打開(kāi)了認(rèn)識(shí)人類(lèi)胚胎發(fā)育基因表達(dá)調(diào)控的大門(mén),將會(huì)為人類(lèi)的優(yōu)生優(yōu)育提供理論基礎(chǔ)。
  • 蘋(píng)果市值兩日蒸發(fā)萬(wàn)億元人民幣!納指挫1.7%,比特幣破歷史新高后暴跌

      若好友不在身邊,那就可以通過(guò)聯(lián)機(jī)模式肆無(wú)忌憚對(duì)好友下黑手,畢竟距離產(chǎn)生美,是吧?在聯(lián)機(jī)模式給到了各位富翁自由選擇,喜歡一戰(zhàn)到底,亦或是時(shí)間有限小玩一把,都可通過(guò)設(shè)置來(lái)決定。本作聯(lián)機(jī)模式新增表情系統(tǒng),發(fā)射飛彈后是不是能用可愛(ài)表情萌混過(guò)關(guān)呢。
  • 買(mǎi)房可落戶(hù)!多地出臺(tái)新政:落戶(hù)門(mén)檻降低 留住年輕人

      3、根據(jù)《公司章程》《深圳證券交易所上市公司自律監(jiān)管指引第1號(hào)一一主板上市公司規(guī)范運(yùn)作》的要求,上述議案為影響中小投資者利益的重大事項(xiàng),需對(duì)中小投資者表決單獨(dú)計(jì)票,單獨(dú)計(jì)票結(jié)果將及時(shí)公開(kāi)披露。
  • 深度解讀!2024年政府工作報(bào)告五大看點(diǎn)

      在快遞新規(guī)實(shí)施的背景下,快遞柜撤柜現(xiàn)象引起了熱議。3月1日,新修訂的《快遞市場(chǎng)管理辦法》正式實(shí)施,其中明確,經(jīng)營(yíng)快遞業(yè)務(wù)的企業(yè)未經(jīng)用戶(hù)同意擅自使用智能快件箱、快遞服務(wù)站等方式投遞快件的行為屬于違規(guī),情節(jié)嚴(yán)重的,將被處1萬(wàn)元以上3萬(wàn)元以下的罰款。
  • 西安交通大學(xué)2018年新增人工智能和大數(shù)據(jù)專(zhuān)業(yè)

      5、會(huì)議費(fèi)用:參加會(huì)議股東食宿及交通費(fèi)用自理。
  • 生娃前后,奶奶和外婆到底有啥區(qū)別?

      總的來(lái)說(shuō),勐煥大金塔確實(shí)值得一看。不為著它背后的宗教意義,即使是作為一件建筑藝術(shù),也不虛此行。