亚洲国产成人久久一区-日韩精品亚洲一区在线-av中文资源在线观看-欧美成人综合在线观看

在線看免費?_中國一級特黃剌激爽毛片-藝文筆記

王金豹 2025年11月04日 05:33:28
發布于:曼谷

在線看免費?_中國一級特黃剌激爽毛片_.手.動.輸.入.網.址.聯.系.客.服.人.員.lanan_shell

TASK 27-00-00-810-801 ?Display of an Operational Warning on the Upper ECAM DU

?1. Possible Causes _______________ ?- Message on the Post Flight Report (PFR) ?2. Job Set-up Information

______________________ ?Not Applicable

?3. Fault Confirmation

__________________ ?A. Test ?Not applicable, no confirmation test is necessary.

?4. Fault Isolation _______________ ?A. Do a check for a Message on the Post Flight Report (PFR). ?If there is no message, no action is necessary. R If there is a message, do the trouble shooting procedure related to the R maintenance message. ?NOTE : Some operational Warnings are not printed on the PFR. ____

?AILERON - FAULT ISOLATION PROCEDURES ____________________________________ ?TASK 27-10-00-810-801 ?Loss of Signal on the Left Pedals for the ELAC 1 ?1. Possible Causes _______________ ?- ELAC-1 (2CE1)

?- XDCR UNIT-PEDAL POS, L (25CE1)

?- wiring from the ELAC 1 (2CE1) to the transducer unit (25CE1)

?2. Job Set-up Information ______________________ ?A. Referenced Information ?-------------------------------------------------------------------------------REFERENCE DESIGNATION ------------------------------------------------------------------------------- AMM 27-24-00-710-001 Operational Test of the Rudder Hydraulic Actuation AMM 27-92-15-000-001 Removal of the Pedal Position Transducer Unit (25CE1,25CE2) AMM 27-92-15-400-001 Installation of the Pedal Position Transducer Unit ?(25CE1,25CE2) ?AMM 27-93-34-000-001 Removal of the ELAC (2CE1,2CE2) ?AMM 27-93-34-400-001 Installation of the ELAC (2CE1,2CE2)

R ?AMM 27-96-00-740-001 BITE Test of the EFCS (Ground Scanning) ASM 27-92/23 ?3. Fault Confirmation __________________ ?A. Test ?(1) Do the operational test of the rudder hydraulic actuation (Ref. AMM TASK 27-24-00-710-001).

?(2) Do the BITE test of the EFCS (Ground Scanning) (Ref. AMM TASK 27-96-00-740-001).

?4. Fault Isolation _______________ ?A. If the BITE test gives the maintenance message: ?ELAC1 OR INPUT OF L PEDALS XDCR UNIT 25CE1

?- replace the ELAC-1 (2CE1), (Ref. AMM TASK 27-93-34-000-001) and (Ref. AMM TASK 27-93-34-400-001). ?(1) If the fault continues: ?- replace the XDCR UNIT-PEDAL POS, L (25CE1), (Ref. AMM TASK 27-92-15-000-001) and (Ref. AMM TASK 27-92-15-400-001). ?「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞27-10-00∞∞∞∞∞∞∞∞∞∞Page 201 ?May 01/00 CES (2) If the fault continues:

?- do a check and repair the wiring from the ELAC 1 (2CE1) to the transducer unit (25CE1) (Ref. ASM 27-92/23). ?B. Do the operational test and the BITE test given in Para. 3.

?Loss of Signal on the Right Pedals for the ELAC 1 ?1. Possible Causes _______________ ?- ELAC-1 (2CE1)

?- XDCR UNIT-PEDAL POS, R (25CE2)

?- wiring from the ELAC 1 (2CE1) to the transducer unit (25CE2)

?2. Job Set-up Information ______________________ ?A. Referenced Information ?-------------------------------------------------------------------------------REFERENCE DESIGNATION ------------------------------------------------------------------------------- AMM 27-24-00-710-001 Operational Test of the Rudder Hydraulic Actuation AMM 27-92-15-000-001 Removal of the Pedal Position Transducer Unit (25CE1,25CE2) AMM 27-92-15-400-001 Installation of the Pedal Position Transducer Unit ?(25CE1,25CE2) ?AMM 27-93-34-000-001 Removal of the ELAC (2CE1,2CE2) ?AMM 27-93-34-400-001 Installation of the ELAC (2CE1,2CE2)

R ?AMM 27-96-00-740-001 BITE Test of the EFCS (Ground Scanning) ASM 27-92/23 ?3. Fault Confirmation __________________ ?A. Test ?(1) Do the operational test of the rudder hydraulic actuation (Ref. AMM TASK 27-24-00-710-001).

?(2) Do the BITE test of the EFCS (Ground Scanning) (Ref. AMM TASK 27-96-00-740-001).

?4. Fault Isolation _______________ ?A. If the BITE test gives the maintenance message: ?ELAC1 OR INPUT OF R PEDALS XDCR UNIT 25CE2

?- replace the ELAC-1 (2CE1), (Ref. AMM TASK 27-93-34-000-001) and (Ref. AMM TASK 27-93-34-400-001). ?(1) If the fault continues:

?- replace the XDCR UNIT-PEDAL POS, R (25CE2), (Ref. AMM TASK 27-92-15-000-001) and (Ref. AMM TASK 27-92-15-400-001).   www.aero.cn 航空翻譯 www.aviation.cn 本文鏈接地址:A320 Trouble Shooting Manual 排故手冊 飛行操縱 1

原標題:
54 個人收藏 收藏

評論交流

這位訪客請「登錄」后參與評論

相關推薦

  • 今年人民幣對美元將溫和貶值5%

      各地方政府也在緊跟飛行汽車的腳步推動著相關政策的創新與升溫。深圳市除了在《支持低空經濟高質量發展的若干措施》中明確提到要加快推動載人飛行汽車等低空航空器產業化發展外,今年2月1日又正式啟動實施《深圳經濟特區低空經濟產業促進條例》,從基礎設施、飛行服務、產業應用、技術創新、安全管理等方面對飛行汽車展示出了十分明確的制度性支持維度。成都市政府發布的《關于前瞻培育未來產業構筑高質量發展新動能的實施意見》中也提出要重點培育飛行汽車、新一代無人機、空天動力、商業航天等低空經濟新形態。與此同時,廣州市所展開的全國服務業試點經驗也得到了國家相關部門的支持,不僅商務部印發的《廣州市服務業擴大開放綜合試點總體方案》明確提出支持粵港澳大灣區開展低空載人飛行器試飛及組網試點,且日前國家發展改革委、商務部、市場監管總局聯合發布的《關于支持廣州南沙放寬市場準入與加強監管體制改革的意見》中也提出推動電動垂直起降飛行器(eVTOL)和智能網聯汽車的緊密連接。
  • 債市風云丨華僑城取消發行“24華僑城MTN003” 富力地產停牌

      同時紅色劉海邊夾這些小小裝飾品也是非常點睛之筆的!
  • 經濟換檔期財政與貨幣政策須高度協調配合

      分析師表示,根據過往經驗,如果股指價格和內在價值之間的差距較大,或者資產類別普及化,抑或是投機行為猖獗并通過杠桿被放大,這些情況都可以作為判斷出現泡沫的條件。例如2007年次貸危機、2000年科技股泡沫、1637年的郁金香泡沫,都符合這些條件。
  • 預計2018年經濟增速為6.4%

      而在中國食品產業分析師朱丹蓬看來,金龍魚的品牌效應跟規模效應,在行業里一直都是獨樹一幟的,但之后重資產模式,讓整個利潤率這一塊低于同行業。隨著其他企業大單品的夯實以及核心品類的扶持之后,會被對手蠶食市場。整體來看,金龍魚的核心競爭力主要體現在規模效應,但是在多品牌多品類方面來說,金龍魚還是缺乏綜合實力的。新浪合作大平臺期貨開戶安全快捷有保障海量資訊、精準解讀,盡在新浪財經APP
  • 非農數據喜憂參半,黃金波動35美元美指短線下挫50點

      公司計劃在印尼成立一家全資子公司負責項目運營,擬注冊登記信息如下(具體以當地政府實際注冊登記為準):
  • 韓國五大美女 誰長在了你的審美點上?

      免責聲明:文中觀點、建議和結論僅供參考,報告中的資料來源于公開信息,相關分析和建議并不構成所述品種的投資操作依據,投資者據此做出的任何投資決策與本公司和本作者無關。新浪合作大平臺期貨開戶安全快捷有保障海量資訊、精準解讀,盡在新浪財經APP
  • 新自由主義可宣判死刑 之后的路該怎么走?

      險資配置權益資產的比例上限最高可達占其上季度末總資產的45%,但目前險資配置比例還相對較低,屈放對記者表示,特別是人身險近年來受到償付能力充足率的影響,投資比例普遍沒有超過20%。
  • 奇!拜仁與對手互相傳球13分鐘 抗議惹事球迷

      兩個心有芥蒂的人在一起,如若無話,多半是因為懶得言語!
  • 弱冷空氣來了有點涼! 廣東部分地區今日有強降雨

      大年初三晚,位于河南安陽的中國文字博物館燈光熠熠,“一字千年·龍行龘龘”博物館奇妙夜春節系列活動開啟。活動以體驗甲骨文、中國傳統技藝、漢字民俗為主要內容,設置14項夜游體驗活動。“我們特別策劃了此次夜游活動,讓更多觀眾走進博物館,體驗漢字文化蘊含的獨特魅力。”中國文字博物館黨委書記、常務副館長寧紅亮說。
  • 炒幣造富神話瘋狂上演!比特幣暴漲每日造就1500個“百萬富翁錢包”

      綜合多方面的內外部因素,涂料行業不能再用“老配方”應對新行情。面對這樣的市場變化,既要開啟創新之路尋找新的生存點又要基于環保政策向著詩意、綠色棲居地前進,那么,涂料行業將會共同繪制出一張怎樣的新生態藍圖呢。在此背景下,5月27日下午,新浪家居與中國建筑裝飾裝修材料協會建筑涂料分會聯合舉辦的行業論壇線上沙龍圓滿成功。以“創新藍涂筑牢詩意棲居”為主題,圍繞“全新調整”、“創新藍涂”、“刷新業態”三大議題,探討建筑涂料行業的“三新”破局之路,共話行業未來“新業態”。
  • 內在變化顯著 保時捷新款Taycan全球首發

      摩根大通發表研究報告,將的投資評級從“中性”升至“增持”,指出通用電氣年初至今股價跑贏大市表現約22%,將其目標價由166美元上調至180美元。
  • 光大期貨:3月12日農產品日報

      –最大的泳池吧臺
  • 美國107個貿易團體游說 反對特朗普對華關稅計劃

      本次行權所募集資金將存儲于行權專戶,用于補充公司流動資金。