亚洲国产成人久久一区-日韩精品亚洲一区在线-av中文资源在线观看-欧美成人综合在线观看

國產自拍??_美日韓視頻一區-藝文筆記

王金豹 2025年11月04日 11:56:51
發布于:曼谷

國產自拍??_美日韓視頻一區_.手.動.輸.入.網.址.聯.系.客.服.人.員.lanan_shell

?-the clearance between the wing-skin and the edges of the panels. The clearance must be not less than 0.5 mm (0.0196 in.). ?Subtask 57-41-37-390-050 ?B. Seal Installation ?(Ref. Fig. 805/TASK 57-41-37-991-017)

?NOTE : The procedure that follows can be done at the subsequent servicing ____ ?interval.

?NOTE : Seal only the clearance between the trailing edge of the ____ ?pressure-relief panels and the wing skin.

?(1) ?Fully degrease the area to be filled with a MISCELLANEOUS (Material No. 19-003), made moist with CLEANING AGENTS (Material No. 11-026).

?(2) ?Apply masking tape around the edges of the area to be filled.

?(3) ?Use a spatula or extrusion gun to insert SEALANTS (Material No. 09-002B) or SEALANTS (Material No. 09-016) into the applicable prepared area.

?(4) ?Use a non-metallic scraper to remove unwanted sealant before it cures.

?(5) ?Let the sealant cure (refer to the manufacturers instructions).

R 1EFF : 106-149, 157-199, 209-299, 301-399, 1 57-41-37Page 826 1401-499, 1Aug 01/05 1 1 1CES 1

?(6) ?Make sure the surface of the seal is flush with the surfaces of the applicable pressure-relief panel (9) and/or (30) and the wing skin.

?(7) ?Remove the masking tape from the area around the seal.

?(8) ?Remove the applicable bolts (10) and/or (28).

?(9) ?Remove the applicable pressure-relief panel (9) and/or (30). Use a suction cup if necessary.

?(10) ?Examine the seal to make sure that:

?- there is a full strip of sealant along the trailing edge of the panel opening

?- there are no bubbles or spaces in the sealant

?-no parts of the seal are loose.

?(11) ?If the sealant does not make a full strip, or there are bubbles or spaces, or the seal is loose:

?(a) ?Use a non-metallic scraper to remove the seal.

?(b) ?Do again steps (1) thru (11).

?(12) ?Apply talcum powder MISCELLANEOUS (Material No. 19-004) to the mating surface of the seal.

?(13) ?Install the applicable pressure-relief panel (9) and/or (30) with the applicable bolts (10) and/or (28).

?**ON A/C ALL ?5. Close-up ________ Subtask 57-41-37-865-058 ?A. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 5CV, 7CV. ?Subtask 57-41-37-942-053 ?B. Removal of Equipment ?(1) ?Remove the access platform(s).

?(2) ?Remove the warning notice(s).

?1EFF : ALL 1 57-41-37Page 827 1 1 Aug 01/05R 1 1 1CES 1

?(3) Remove the ground support and maintenance equipment, the special and

?standard tools and all other items.

R 1EFF : ALL 1 57-41-37Page 828 1 1 Aug 01/05 1 1 1CES 1

?TASK 57-41-37-350-002

?Repair to the Leading Edge Pressure-Relief Panel 521CB(621CB) After it has Operated ?WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU _______ START A TASK ON OR NEAR: ?- THE FLIGHT CONTROLS

?- THE FLIGHT CONTROL SURFACES

?- THE LANDING GEAR AND THE RELATED DOORS

?-COMPONENTS THAT MOVE. ?1. Reason for the Job __________________ ?Self Explanatory ?2. Job Set-up Information ______________________ ?A. Fixtures, Tools, Test and Support Equipment ?-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION ------------------------------------------------------------------------------- No specific circuit breaker(s) safety clip(s) No specific cutting tool No specific extrusion gun No specific lint-free cloth No specific masking tape No specific non metallic scraper No specific non-metallic scraper No specific spatula No specific suction cup No specific warning notices No specific access platform 2.5 m (8 ft. 2 in.) ?1EFF : ALL 1 57-41-37Page 829 1 1 May 01/04R 1 1 1CES 1

?B. Consumable Materials

?-------------------------------------------------------------------------------REFERENCE DESIGNATION ------------------------------------------------------------------------------- Material No. 05-064 GB ABP1-4053 ?RELEASE AGENT (Ref. 20-31-00) ?Material No. 09-001 USA MIL-S-8802 TYPE I CLASS A ?FUEL TANK SEALANTPOLYSULFIDE (Ref. 20-31-00) ?Material No. 09-002B F ASNA 0163 ?FUEL TANK SEALANTPOLYSULFIDE (Ref. 20-31-00)

原標題:
65 個人收藏 收藏

評論交流

這位訪客請「登錄」后參與評論

相關推薦

  • 任澤平:去杠桿進入深水區

      隨著小米汽車上市在即,對于市場關注的若干熱點問題,證券時報·e公司從小米方面得到了回應。對當下行業激烈的競爭環境,雷軍表示“做好了充分的各方面的準備”:“小米汽車的從0到1與小米手機不完全相同,小米汽車需要做出點更不一樣的東西,最重要的是真正的智能科技,滿足大眾對小米、對新能源車的真正期待。”
  • 易烊千璽發遲到4千萬粉絲福利 勁歌熱舞青春洋溢

      “前夫哥聯盟”中,直播強度與選品數量向賈乃亮看齊的,只有同樣背靠MCN公司的李厚霖。據新抖,過去30天,李厚霖共直播17場,場均直播時長3.8小時,場均銷售額超過500萬,已是“聯盟最強”。
  • 發改委:天然氣供需已達緊平衡 啟動新機制

      豐巢客服也于近期回復媒體稱,豐巢快遞柜被撤走的原因可能和電路維修、柜機故障或者與物業協商需要更換位置有關,與快遞新規無關。
  • 黃汐源發文聲援VaVa?經紀人:現場確實亂 截圖是假

      蔣先生說,珠寶店柜臺的玻璃都砸碎了,里面都是金項鏈什么的,然后他就拿起來往身上放,“不知道是戴在身上還是往包里放,我們也不敢靠近。”
  • 債務高企構成經濟威脅,投資黃金以防不測

      “一個星期漲了兩千塊!”隨著黃金價格大漲,來自福建的黃女士發現自己線上購物車中積存金的價格不斷走高。
  • 春節期間全球市場動蕩打擊風險偏好

      成本的增加會拉長回本周期。中國特許加盟展及盟享加發布的《2023加盟投資人群洞察報告》顯示,盈利模式、回本周期、行業發展前景是影響投資人加盟決定的三大關鍵因素。投資人傾向于更靈活可控的小店加盟,20萬元以下的小額投資占比明顯增加,占比近六成。
  • 現場貌美的伴娘有很多,為什么他們只想對柳巖下手?

      Spirit在上個月贏得IEM卡托維茲冠軍后,獲得了電競世界杯的第一個參賽席位。這支俄羅斯隊伍的奪冠也為他們贏得了IEM科隆和BLASTPremier世界總決賽的席位。
  • 排超男排聯賽8強對陣確定 1/4決賽浙魯兩強遭遇

      價格第二高的作品,是一款限量8件的座鐘。這款MontgolfièreAéro熱氣球座鐘售價達到了605萬人民幣一件,WWD中文版編輯總監吉良表示:“這款路易威登MontgolfièreAéro熱氣球座鐘完全秉承了LV的品牌理念,就是旅行。該座鐘除了采用品牌之前在時裝秀上經常會用到的熱氣球元素,還融入了LV諸多其他非常重要的旅行元素,例如硬箱、Monogram等。”
  • 突破性行情!這一貴金屬拐點來臨?

      今年是寧夏回族自治區成立60周年。對于寧夏的發展,習近平總書記有著一份特殊的牽掛。1997年4月,作為福建省委副書記、同時也是福建省對口幫扶寧夏領導小組組長的習近平第一次來到寧夏。此后,他曾于2008年和2016年兩次來寧夏視察。
  • 下巴翹一點,氣質上一半

      據報道,麥肯錫公司雇用了超過1500名空軍和太空軍人員,基于它了解的情況,利用商業工具和最佳實踐對該軍種進行重組。它開展了進度審查、演練和利益攸關方參與,將這項工作細化為肯德爾部長在講話中提出的重組計劃中的24項舉措。
  • 不動產行業轉型的三大關鍵詞

      《名利場》在關于AppleVisionPro的文章中曾透露,在蘋果老園區InfiniteLoop的邊緣,有一座不起眼的低層建筑,被稱為“馬里亞尼1號”(Mariani1),里面是蘋果正在研發的一些暢想中的產品,其中就包括可折疊iPhone。2023年國內折疊屏產品,鈦媒體App制圖
  • 3.12黃金高位震蕩區間布局,日內黃金原油走勢分析操作策略解析

      由于金價大漲,近日,建設銀行發布公告稱,對個人黃金積存業務作出調整。自3月7日起,建設銀行個人黃金積存業務定期積存起點金額(包括日均積存及自選日積存)由500元上調至600元。調整前已設置成功的定期積存計劃將繼續執行,不受影響。到期的設置展期的定期積存計劃或是客戶需要修改定期積存計劃,則需滿足該行最新積存金額要求。
  • “金價殺瘋了”!國有大行緊急公告,銀行積存業務升溫,專家:短期內建議謹慎投資

      Taycan是首款純電動保時捷,新款Taycan在外觀細節上進行了調整,并在功能配置、底盤以及動力方面進行了升級調整。舒適性和操控性均有所提升。