亚洲国产成人久久一区-日韩精品亚洲一区在线-av中文资源在线观看-欧美成人综合在线观看

糖心logo官網?_國產亞洲中文日本不卡二區-藝文筆記

王金豹 2025年10月31日 15:22:24
發布于:曼谷

糖心logo官網?_國產亞洲中文日本不卡二區_.手.動.輸.入.網.址.聯.系.客.服.人.員.lanan_shell

B. Consumable Materials ?------------------------------------------------------------------------------- REFERENCE DESIGNATION ?------------------------------------------------------------------------------- R Material No. 02-003 F NSA 307110 TYPE 4 HYDRAULIC FLUID (PHOSPHATE ESTER BASE) (Ref. 20-31-00) Material No. 04-004 USA MIL-PRF-23827 TYPE I SYNTH.ESTER BASED GREASE HIGH PRESSURE (Ref. 20-31-00) Material No. 05-005 USA MIL-C-16173 GRADE II CORROSION PREVENTIVE (Ref. 20-31-00) Material No. 08-029 USA MIL-R-46082 TYPE I ADHESIVE (Ref. 20-31-00) Material No. 09-013 USA MIL-PRF-81733 TYPE I CLASS A CORROSION INHIBITING BRUSH CONSISTENCY (Ref. 20-31-00) Material No. 16-003 F ASNB70720 COATING (OBSOLETE USE 16-021) (Ref. 20-31-00) ?C. Expendable Parts ?------------------------------------------------------------------------------- FIG.ITEM |DESIGNATION |IPC-CSN ?------------------------------------------------------------------------------- cotter pins 27-26-04 02 -050 ?D. Referenced Information ?------------------------------------------------------------------------------- REFERENCE DESIGNATION ?------------------------------------------------------------------------------- 22-63-00-710-001 Operational Test of the Yaw Damper Function 22-96-00-710-001 Operational Test of the AFS 22-97-00-710-001 Operational Test of the LAND CAT III Capability 24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied ?from the External Power 29-00-00-864-001 Put the Related Hydraulic System in the Depressurized ?Configuration before Maintenance Action ?29-00-00-910-002 Safety Procedures of the Hydraulic System ?29-14-00-614-001 Depressurization of the Hydraulic Reservoirs

?------------------------------------------------------------------------------- REFERENCE ?DESIGNATION ?------------------------------------------------------------------------------- 29-14-00-614-002 ?Pressurization of the Hydraulic Reservoirs through the Ground Connector ?55-33-13-010-002 ?Opening/Removal of the Trailing Edge Access-Panels 325EL, 325ER, 325DL, 325DR, 325CL, 325CR, 325BL and 325BR ?55-33-13-410-002 ?Closing/Installation of the Trailing Edge Access-Panels 325EL, 325ER, 325DL, 325DR, 325CL, 325CR, 325BL and 325BR ?27-26-51-991-001 ?Fig. 401 ?3. Job Set-up __________ ?(Ref. Fig. 401/TASK 27-26-51-991-001) ?Subtask 27-26-51-860-054-A ?A. Aircraft Maintenance Configuration ?WARNING : OBEY THE HYDRAULIC SAFETY PROCEDURES. _______ ?(1) ?Obey the hydraulic safety procedures (Ref. TASK 29-00-00-910-002).

?(2) ?Make sure that the adjustable access platform is in position at zone

?325. R (3) Make sure that the access panel 325BL (for 3CC1) or 325BR (for 3CC2) R is open (Ref. TASK 55-33-13-010-002). ?(4) ?Make sure that the rudder pedals are in the neutral position.

?(5) ?Make sure that the RUD TRIM indicator on the center pedestal, on the panel 110VU shows 0.

?(6) ?Make sure that the warning notices are in position in the cockpit to tell persons not to operate the flight controls.

?(7) ?Make sure that the hydraulic systems are depressurized and put them in the maintenance configuration. (Ref. TASK 29-00-00-864-001).

?(8) ?Make sure that the reservoirs of the Green and Yellow hydraulic systems are depressurized (Ref. TASK 29-14-00-614-001).

?(2) ?Inspection of the attachment components.

原標題:
84 個人收藏 收藏

評論交流

這位訪客請「登錄」后參與評論

相關推薦