亚洲国产成人久久一区-日韩精品亚洲一区在线-av中文资源在线观看-欧美成人综合在线观看

在線看免費?_歐美zooskoolknotty豬-藝文筆記

王金豹 2025年10月31日 21:25:30
發布于:曼谷

在線看免費?_歐美zooskoolknotty豬_.手.動.輸.入.網.址.聯.系.客.服.人.員.lanan_shell

?AIR COOLING SYSTEM - REMOVAL/INSTALLATION _________________________________________ TASK 21-52-00-920-001 R Removal and Replacement of the Combo and Periseals in the Air Conditioning Pack R Ducts ?1. Reason for the Job __________________ ?Refer to the MPD TASK: 215200-07 ?2. Job Set-up Information ______________________ ?A. Referenced Information ?-------------------------------------------------------------------------------REFERENCE DESIGNATION ------------------------------------------------------------------------------- R 21-51-51-000-001 R 21-51-51-400-001 R R 21-52-16-000-001 R 21-52-16-400-001 R 21-52-21-000-001 R 21-52-21-400-001 R 21-52-23-000-001 R R 21-52-23-000-002 R R 21-52-23-000-003 R R R 21-52-23-400-001 R R 21-52-23-400-002 R R R 21-52-23-400-003 R R R 21-52-24-000-001 R R 21-52-24-400-001 R R 21-52-31-000-001 R 21-52-31-400-001 Removal of the Pack Flow-Control Valve 8HB and (11HB) Installation of the Pack Flow-Control Valve 8HB (11HB) Removal of the Water Extractor 10HM8 (11HM8) Installation of the Water Extractor 10HM8 (11HM8) Removal of the Air Cycle Machine 10HM1 (11HM1) Installation of the Air Cycle Machine 10HM1 (11HM1) Removal of the Pipe Assembly between the Main Heat Exchanger and the Air Cycle Machine Removal of the Pipe Assembly between the Anti-Ice Valve, the Bypass Valve and the Air Cycle Machine Removal of the Pipe Assembly between the Anti-Ice Valve and the Bypass Air Duct of the Primary Heat Exchanger Installation of the Pipe Assembly between the Main Heat Exchanger and the Air Cycle Machine Installation of the Pipe Assembly between the Anti-Ice Valve, the Bypass Valve and the Air Cycle Machine Installation of the Pipe Assembly between the Anti-Ice Valve and the Bypass Air Duct of the Primary Heat Exchanger Removal of the Heat Exchanger Unit 10HM4 (11HM4) (From the Aircraft) Installation of the Heat Exchanger Unit 10HM4 (11HM4) (Into the Aircraft) Removal of the Reheater 10HM3 (11HM3) Installation of the Reheater 10HM3 (11HM3) -------------------------------------------------------------------------------

REFERENCE DESIGNATION ?------------------------------------------------------------------------------- 21-52-32-000-001 Removal of the Condenser 10HM2 (11HM2) ?21-52-32-400-001 Installation of the Condenser 10HM2 (11HM2) ?21-61-53-000-001 Removal of the Bypass Valve 10HH (30HH) ?21-61-53-400-001 Installation of the Bypass Valve 10HH (30HH)

?3. Job Set-up __________ ?Subtask 21-52-00-010-069

?A. Not applicable ?4. Procedure _________ ?Subtask 21-52-00-920-050 R A. Remove, discard and replace the seals in: R (1) The flow control valve (Ref. TASK 21-51-51-000-001) and (Ref. TASK ?21-51-51-400-001). ?(2) ?The water extractor (Ref. TASK 21-52-16-000-001) and (Ref. TASK 21-52-16-400-001).

?(3) ?The air cycle machine (Ref. TASK 21-52-21-000-001) and (Ref. TASK 21-52-21-400-001).

?(4) ?The pack connection pipes (Ref. TASK 21-52-23-000-001) and (Ref. TASK 21-52-23-400-001),

?-(Ref. TASK 21-52-23-000-002) and (Ref. TASK 21-52-23-400-002), ?-and (Ref. TASK 21-52-23-000-003) and (Ref. TASK 21-52-23-400-003).

?(5) ?The heat exchanger area (Ref. TASK 21-52-24-000-001) and (Ref. TASK 21-52-24-400-001).

?(6) ?The re-heater (Ref. TASK 21-52-31-000-001) and (Ref. TASK 21-52-31-400-001).

?(7) ?The condensor (Ref. TASK 21-52-32-000-001) and (Ref. TASK 21-52-32-400-001).

?(8) ?The bypass valve (Ref. TASK 21-61-53-000-001) and (Ref. TASK 21-61-53-400-001).

?AIR COOLING SYSTEM - ADJUSTMENT/TEST ____________________________________ ?TASK 21-52-00-710-002 ?Operational Test of the Air Cooling System

?1. ?Reason for the Job

__________________ ?Self Explanatory

?2. ?Job Set-up Information

______________________ ?A. Referenced Information ?-------------------------------------------------------------------------------REFERENCE DESIGNATION ------------------------------------------------------------------------------- 21-61-00-710-001 ?Operational Test of the Pack Temperature-Control System ?3. Job Set-up __________ ?Subtask 21-52-00-010-054

?A. Not applicable. ?4. Procedure _________ ?Subtask 21-52-00-710-052

?A. Do the operational test of the pack temperature control (Ref. TASK 21-61- 00-710-001) R TASK 21-52-00-780-001

?Pressure Drop Test of the Reheater 10HM3 (11HM3) ?WARNING : MAKE SURE THAT AIR IS NOT SUPPLIED TO THE AIR CONDITIONING SYSTEM   www.aero.cn 航空翻譯 www.aviation.cn 本文鏈接地址:A320飛機維護手冊 AMM AIR CONDITIONING 空調 4

原標題:
16 個人收藏 收藏

評論交流

這位訪客請「登錄」后參與評論

相關推薦

  • 港珠澳大橋即將正式通車 這10件事你要知道(圖)

      更能突出個人高級的質感,彰顯出非凡的品位與審美。
  • 快訊:地熱能活躍領漲 漢鐘精機等5股漲停

      強大的國際金融中心是金融強國得以在全球掌握資源配置權和重要國際金融產品定價權的工具和抓手。過去英國成為“日不落”的帝國,有倫敦這個國際金融中心為其助力。第二次世界大戰后,美國擁有紐約等國際金融中心,影響和左右著全球金融資源的配置,助力美國成為金融強國。20世紀90年代以來,中國的國際金融中心迅速崛起,尤其是上海國際金融中心的銀行間市場、股票市場、外匯市場,債券市場快速成長,已成為全球最重要的國際金融中心之一,但與紐約和倫敦相比仍有一定差距。上海市場的人民幣仍不能完全自由兌換,資本流動尚有一定限制;衍生產品市場發展緩慢;股票市場制度建設相對滯后,證券業弱小,股票市場供求關系不平衡,等等。我國要成為金融強國,國際金融中心建設需要加快改革開放的步伐。
  • 10萬億紅利資產跳水 分析人士:熱度過高是主因 紅利資產的性價比依然存在

      教育是每年全國兩會期間代表委員們關注的重點之一。
  • 中銀管濤:從三組數據看美國制造業回流現狀

      三、通過深交所互聯網投票系統投票的程序
  • 緬北傳來一個好消息

      委托人身份證號碼(委托單位營業執照號碼):
  • 第四艘航母是否核動力?海軍政委:很快會公布!

      3月10日晚間披露關于公司董事長、控股股東、實際控制人提議公司回購股份的公告。公告顯示,公司董事長、控股股東、實際控制人張立新基于對公司未來發展的信心和對公司價值的認可,為增強投資者信心和維護廣大投資者的利益,促進公司長遠、健康和可持續發展,向公司董事會提議公司以自有資金或金融機構借款通過上海證券交易所交易系統以集中競價交易方式回購公司已發行的部分人民幣普通股(A股)股票,回購資金總額不低于人民幣4000萬元(含),不超過人民幣8000萬元(含)。
  • 太平鳥止住了虧損,但難再續寫增長神話

      3月12日消息,人工智能初創企業OpenAI對億萬富翁埃隆·馬斯克(ElonMusk)的指控做出了措辭嚴厲的反擊,并在法庭文件中表明,馬斯克的指控“建立在令人費解的、往往自相矛盾的事實基礎之上”。
  • 日本30年來最重要一次“春斗”

      全屋房門采用推拉式設計,地面無高差設計,墻面陽角防撞處理,防止老人磕碰。同時,窗邊的電動晾衣架配有自動感應系統,感應到人在下方會自動停止移動,為長者增添一份保障。
  • 赴烏參戰負傷回國 韓國網紅面臨調查

      可是,像小羽這樣逆襲之后又雪崩式反彈的例子,也并不在少數。這是因為很多人會在口欲期和肛欲期之間搖擺不定:狀態良好時,就逆流而上;遭遇打擊時,就瘋狂退行,用口欲期的方式來緩解焦慮。
  • 官宣:NRG正式簽下Walco

      當地時間3月10日早間,摩根士丹利披露研報稱:隨著價格戰接近尾聲,準備通過新一代大規模生產線提高成本效率,并擴大在凈資產收益率方面的優勢,看到寧德時代在基本面上的多個拐點,上調公司評級至超配,并選為行業首選。
  • 下半年GDP增長何去何從?

      編導:鄧馳旻
  • 習近平簽署國家主席令

      鄭銳彬《靈域》
  • 美元與黃金脫鉤非美國金融霸權根源

      創造這種陰謀論的人,絲毫不了解輸掉暫定世界頭銜對于張志磊意味著什么。竟然順理成章地認為,二番戰是張志磊想打就能打的。
  • 2039年中國GDP完全可能超過美國

      這幾乎是革命性的,在Agent日漸成熟的情況下,很多行業的許多環節都能夠被改寫,甚至取代。